Ham Kiem solar power plant project with a capacity of 15MW (phase 1), the plant will contribute more than 10 million kWh annually to help overcome the power shortage in the region and the whole country, ensuring energy sources for the socio-economic development of the province and the region. Cam Pha Electrical Equipment Joint Stock Company provides products for the power transformer project for the 110kV transformer station meeting the technical specifications for Ham Kiem power plant: 3-phase power transformer, outdoor installation type 63 MVA-115/23kV with full insulation oil, 24kV lightning arrester, equipment for installation and connection. The project builds many items on a total area of nearly 110ha, installs many solar panels and DC/AC converter Inverters integrated with 0.4kV/22kV step-up transformers; A 22kV/110kV transformer station with a large capacity step-up transformer, a 0.592km long double-circuit 110kV line, is connected to the existing Binh Thuan 110kV line and other auxiliary works.

Truc Son Solar Power Project
Truc Son Solar Power Plant Project has a designed capacity of 44.4 MWp, with a total investment of more than 1,107.9 billion VND, deployed on a total area of 50.77 hectares in village 5, Truc Son commune (Chu Jut) - Dak Nong province.

Sao Mai Solar Power Project
Sao Mai Solar Power Plant Project is a large-scale grid-connected solar power plant model built under the build-own-operate method. The project is located in An Thanh Hamlet, An Hao Commune, Tinh Bien District, An Giang.

Bau Ngu Solar Energy Project
The Bau Ngu Lake Solar Power Plant Project is a large-scale grid-connected solar power plant model built under the Build-Own-Operate (BOO) method. The project is located in Bau Ngu village, Phuoc Dinh commune, Ninh Thuan province.